4. The Physical Regeneration of Stag Works
Back to The Project Menu

Feedback from the Local Authority
Sustainable Design

The recent building surveys and re-design exercise identifies great potential in restoring and transforming Stag Works, making it appropriate for use in the 21st Century for multi-occupation business use. The survey concludes that Stag Works, despite its present condition, appears to be structurally sound, and in a very reasonable state of repair.

The proposed new use tends itself exceptionally well to the original design with no significant alteration to the building's layout or footprint.

The following key features of the refurbished building have been identified:

  • The provision of 40-60 office, workshop and studio spaces.
  • A gross floor area of just over 2,000 m2 or 22,000 sq.ft of which 16,233 sq.ft will be lettable.
  • The introduction of two lifts and new external walkways to the courtyard will substantially improve access for all users and allow for maximum flexibility in the creation and use of the lettable space.
  • New toilet provision including facilities for physically disabled people wilt be located on every floor, replacing the existing outside toilets.
  • The original, ornate showroom on the first floor will become a community resource used for training and meeting purposes.
  • A Cafe Bar along the John Street elevation will provide a focal point for tenants, visitors and the public.
  • The small venue located adjacent to the Cafe Bar within the courtyard will also act as a showcase for music products and act as a base for other musical performances and training projects.
  • The outside courtyard will be multi-functional, acting as an oasis for the complex, providing disabled car-parking and serving as an outdoor venue and events area.

Feedback from the Local Authority
Discussions with the Sheffield City Council Planning and Heritage Officers regarding the proposed refurbishment works have been very positive. They are very keen to see this unique industrial heritage site preserved and brought back into full use, and have been supportive of the alterations and improvements proposed.

Sustainable Design
The design team is fully committed to all aspects of sustainable design and this would be implemented in the future refurbished building.